请英语高手帮忙翻译一段内容,非常感谢!

2024-12-03 16:42:06
推荐回答(1个)
回答1:

The implementation stage of the project cost control
Project implementation phase is building, entity is human, material and financial resources consumption of main stages. Large quantities, broad, influence factors and the construction period, the policy change, materials, equipment price fluctuations in large market demand and supply, etc. To improve the quality control of construction, the construction cost and benefit of investment in the implementation stage, strengthen the management and supervision of project construction, thus strengthening the functions of project construction process, the construction cost control. Due to the complexity of the construction project, the influence factors of the variety characteristics of project implementation stage, often appear some unexpected fee.
1 and effective control engineering change and economic visa In the engineering construction project, engineering change and on-site visa is inevitable, but to have control of the production. In order to prevent the loopholes in the working drawing design, produce in the review, also should control of the party in the joint checkup of drawings so, design institute in the technical consultation, anyhow, should be in before commencement. Design change should try to advance, change occurs earlier, the smaller, and loss. Therefore, we must strengthen the management of design change, change more control in the design stage, especially the design phase of the great influence of engineering cost more to use design change, after the first get change, engineering cost to solve effectively controlled.
2, strict construction drawing budget review According to the working drawing design plan and the actual schedule, timely approved construction drawing budget. The budget for budget exceeds corresponding construction drawing design, want to be part of a detailed analysis, find out the reasons, and promptly with project manager, adjustment or fixed ventilation of engineering cost control, the dynamic control implementation.
3 and optimize the subcontractor,. In the construction of professional work, some special to entrust a specialized construction units, such as variable to compensate for that electricity installation engineering, communication engineering, greening projects, etc, which often contains certain monopoly nature. Such as: each building distribution system of investigating purpose by power supply departments must be responsible for the subordinate industry from equipment procurement to install high contracting. And the price is fixed. In these projects, the first power supply departments should respect the "regulation", the total contracting by his distribution system, on the other hand allow another supplier to participate in the competition, finally obtained good effect, equipment purchase price bureau of electricity than lending originally designated firms offer drop 20% the left and right sides.
4 and in-depth field, collect and master construction relevant material In the construction process, ShenJia personnel and cost control personnel are controlled at construction site, drawing construction, supervision, sometimes with general contractor and construction personnel, understanding, collecting project discussion about information and control field construction, Assist owners timely review for design change, on-site visa fees, corresponding adjustment and control target for the final project summary is provided the basis and do the necessary preparations