工厂参观英文,请高人帮忙翻译成英文一下,小弟急用

2024-12-16 09:54:50
推荐回答(3个)
回答1:

The customer must arrive our factory visit, I must introduce, asks the person of high skill to help the translation English, the little brother urgently needs the commentary: Welcome fellow distinguished guests to visit the machine shop, our new building occupying a land area of 20000 squares, are completed in December, 2008, at present is being under construction and installs debugs the equipment, estimated will complete in the end of the month, mid-April the inputs will produce, estimated will produce can be 35K each month. Was sorry very much at present cannot let everybody see to a complete production condition, we can explain and the scene union way, lets you as far as possible many understanding organization factory ~ if in the visit process, you has any question, may although proposed, we can have the personnel to do for you explain ~ The organization factory probably has about the staff 300 people, at present this building 1,2,5,6 and produces the location for ours work, now we are at a building, is the ramming manufacture department, is responsible for NCT, the ramming manufacture.The ramming manufacture department staff probably has 82 human of ~ please here to walk, here has three NCT equipment (numerical control machine), two Taiwan calendar Pu and a Amada.NCT numerical control engine bed has the efficiency to be high, accuracy high and processing convenient characteristic.It the formula which makes through the analysis blueprint inputs the control bench to send out the command control different drift impact plate to achieve the different ramming effect, has flushes mesh, nibbles, the cutting edge angle and so on many kinds of processing way ~ in the factory NCT equipment may process many kinds of plates at present, thickness request is.Our multipurpose NCT pulls the product or produces some small batches product ~ works as us Please here walk, here is the mold depositing area, uses for to deposit us to produce the aircraft type the mold, at present has pould frame 16, probably may deposit set of mold ~ Here is the ramming 1 area and 2 areas, altogether has 45 tons, 60 tons, 80 tons, 110 tons, 160 ton and 200 ton different tonnage punch presses 37 and 60 ton continual punch presses. Some quantity quite stable aircraft type, can consider likely uses the die stamping the way to produce ~ Here is the ramming 3 areas, was introducing a moment ago NCT or mold ramming processing from now on plate, we will be able to continue to process, for instance: Hits the rivet, pulls out attacks the tooth and so on, can use here the equipment, at present in the factory has pulls out hole machine 3, attacks tooth machine 4, rivet machine 1 ~ processes after these working procedures, we can to the plate carry on the knee bend, at present in the factory has booklet bed 10. In if the engine case has the part which the need unifies or on the one hand and on the other hand union, can use the spot welding, at present in factory a little welding machine 14. (Because in spot welding time temperature is high, water tank is carries on radiation to machine equipment) OK, this is building ramming manufacture department condition ~ Please here step onto the staircase, 2 buildings are organization factory host office district, can have including RD, ME, PMC, MPM, QE and so on about 35 people in here work ~ OK, please here walk the staircase (on elevator), 4 buildings and 5 buildings at present vacant, but also has not planned use ~ Good, we arrived 5 buildings, here is assembles the manufacture department, can establish 3 groups to install wiring in here, that side another half region assembles the material classification storage area, can lay aside the line material, the hardware, the revertex class material, the organization components and Bao Cai~ assembles the manufacture department to be able to have about the staff 53 people, at present also in construction stage, therefore we only can see has a group to install wiring in here, asks the excuse me ~ group to install wiring mainly is can assemble some independent engine cases, in the process can have in view of the power source, the line material, the ventilator peaceful gauge test and the function tests ~ for instance to look at the ventilatorWhether normal work, power source voltage electric current test and so on ~ Please here step onto the staircase (on elevator), was sorry very much, our 6 building floors are brushing guard against the static electricity paint, has not done, therefore is unable to look temporarily, only can glance over in the elevator mouth, I can probably introduce here condition, 6 buildings are the baking varnish manufactures department, at present everybody may see roasted the paint line to one already to erect automatically finished, he contained in front of one to process the line and automatically roasts paint line ~ in to roast the paint line that side the diagonally opposite prints the room, could have moves copier, oven roasts the paint line with silk ink pad three ~ to have probably 62Staff ~ The baking varnish met the past to process starts, after high-quality goods, could start the autocycle production from that side, carried on the pre-degreasing, the clear laundering, the epithelium, the table adjusted and so on the pretage working procedure, after in order to clean up machine component surface greasy dirt ~ then process drying, then passed through the automatic spraying system, carried on the static electricity spraying and the automatic spray point (spray point is in order to reduce not good or nips flowered request), after then the roasting, carried on the quality testing, not good has not acted according to requests to carry on superficial printing (silk India or moves India), again baked above ~ is baking varnish basic flow ~ To this, to the machine shop the introduction basic conclusion, thanks everybody participation ~ thanks the distinguished guests arrives visits, has the deficiency, please propose, thanks ~

回答2:

This way, please take the stairs (up elevator), I am sorry, 6 floor, our floor is antistatic brush paint, and also do NOT, therefore temporarily unable to look into and can only glance at the elevator lobby, I will perhaps tell us here condition, 6 floor, paint manufacturing department are, at present we can see a

Automatic paint line has been set up, he included a pre-treatment line and an automated paint line ~ in the paint lines are printed diagonally opposite side of room, there will be a pad printer, screen printing ovens Units One and Three Units Units ~ paint line has approximately 62 staff ~

回答3:

你写的机械厂介绍不错