River water damage restoration of lining concrete slab construction elements analysis
Abstract: The project has been in operation for twenty years, shouguang paragraph River water precast concrete panels slope because of frost heave damage and serious damage to groundwater uplift pressure, and some sections have been a threat to the safety of the dam water river. Repair process, in strict accordance with the construction procedure of the construction and construction work, repair, results were very good. Guarantee the normal operation of the river water.
Keywords: water river; slope lining; repair works; Construction Quality