在线等:翻译合同中的几句话

2025-01-07 19:02:20
推荐回答(2个)
回答1:

1. The annex to this contract " ....designed brochures " Together with the contract effectively.
2. Advance payment received after the effective date of the contract is.
3. After the effective contracts, 10 working days for all the parties to complete the design drawings and programs, cross-checking to be countersigned. Sign the final document as a basis for manufacturing and inspection, the demand-side before that to amend the program without the need to bear the cost; the next, such as amendments to the program, it would take charges as appropriate.

回答2:

1 this contract accessory design specification "... ". Together with the contract.
2 after receiving advance. For the effective date.
3 after the contract; 10 days, supplier completed all design drawings and solutions, the audit sign. Sign files as last manufacturing and acceptance, the buyer before this amendment plan, no expense, After such modifications required, must according to charge.
The rapture