麻烦高手帮忙翻译一下

2025-01-04 02:16:55
推荐回答(4个)
回答1:

Winter and rain-phase construction measures (1) the construction of Phase I of rain measures 1, paving the road construction site formation, installed drainage ditches, installed in the external water drainage infrastructure, and established two collection sump, the pump Channel 2. 2, before the onset of the rainy season, preparation of plastic sheeting, canvas and other rain appliances. 3, bar display are located at higher levels, and placed at the bottom Dianmu. Open piles, covered in cloth covered with rain. 4, site through various channels of information on local climate and weather condition, in order to be able to take defensive measures. 5, finished steel processing building from the ground need to set up to prevent corrosion and mud pollution, and to prepare for rain. 6, steel welding venues rain facilities to prevent joint respectively, occurred brittle fracture. 7, and the construction of electrical distribution box stamping plastic reproduction flooded leakage. 8, rainfall increased moisture over gravel, mix should be adjusted. (B) Construction of facilities for winter 1, to ensure the quality of construction in winter, to achieve progress, the need for winter construction skills training; 2, raw materials used in the project approaching, the need for testing of raw materials, in order to pass; 3, the construction site layout, layout point of fire facilities, particularly in the use of fire, electric heating construction site, must be clearly marked, the road should be open, timely removal of snow and frozen by the distribution of fire safety requirements, and facilities were set up regular inspections; 4, in the winter season outdoor temperature may reach 10 degrees Celsius below Wall again and under the law drilling mud during the construction period shall be guaranteed from the freezing mud; 5, entered the cold season, one-time seasonal maintenance on machinery and equipment, construction safety technology development cold season, and the use of mechanical equipment operatives safety education for the cold season. 6, Winter Construction, the construction site should do planar design, layout good inflammable, explosive material storage, such as oxygen bottles, fuel, etc., should stay away from the fire source, the classification of isolated storage; 7, 6 or above the level of the snow storm, not for construction lifting operations. 8, steel welding (1) in indoor or welded steel hub was to be carried out, such as in outdoor welding, environmental temperature is not lower than -20 degrees Celsius, while wind storms should all just good welding joints prohibited touched snow. (2) began to flash before the flash butt welding reinforced several contacts so that the temperature increases, the pressure to increase contacts preheater, preheat interval extended cremate medium temperature appropriate to slow down the process, well after welding joints appropriate insulation to prevent the rapid drop in temperature, joints embrittlement phenomenon occurred.

回答2:

你要告诉大家你要将这些文字翻译成什么语言啊!

回答3:

这样的翻译给100分也不见得有人真翻,大部分答案都是照抄机器翻译,你还不如自己去做.
http://www.google.com/language_tools?hl=zh-CN

回答4:

好高难度哦.估计是要翻译成英语的.