求专业英文翻译 如下:

2024-12-25 11:14:02
推荐回答(2个)
回答1:

1 new product introduction (personnel allocation,process optimization, equipment purchase and arrangement, capacity management,production cost control); SOP and Flo wchart; 2 hours of E,the updating and maintenance man-hour system; 3 assess the manufacturing cost,standard working hours and improve the formulation,evaluation database,reduce the waste of resources; 4 to assist the production line to solve problems,reduce the production of interference factors; 5 engineering analysis,work analysis, implementation process rationalization and production line optimization; 6 operating efficiency analysis and improvement,man-machine operation analysis and improvement of efficiency, from the SMT point,paste,drawing and assembly line optimization,operation optimization and process optimization, improve production line balancing; Capacity evaluation,improvement and cost control of 7 production lines of various products; Comprehensive utilization of 8 production line equipment analysis and production line rate balance improvement,improve production line PPH (per capita capacity); And maintenance of 9.BOM,MC Plan, Routing system implementation; 10 coordinate planning,production department of equipment,personnel maximum yield analysis and evaluation and scheduled delivery cycle.

回答2:

1. New product introduction (staffing, process optimization, equipment
purchasing and organization of features, capacity, production cost
control);SOP and flowchart completion;

2. E-work, the update and maintenance of the work manage system;

3.Evaluation of manufacturing cost, standard work, database development,
assessment, and improvement of, and reduce the waste of resources;

4. Help line solve the problem, reduce the interference factors of production;

5. Engineering analysis, job analysis to achieve rationalization of processes and production
line optimization;

6.Analysis and improvement of efficiency, human-machine job matching
efficiency analysis and improvement, from SMT to point up, punching and
assembly line optimization, optimization and process optimization,
upgrading production line balancing;

7. Production line capacity assessment, improvement and cost control of various products;

8.Production line of analysis on the comprehensive utilization of
equipment and balancing improvements, enhance production-line PPH
(capacity when per capita);

9.BOM, MC import Plan, Routing systems, and maintenance;

10.Coordination of plans and production departments on the maximum
productivity analysis equipment, personnel and ship cycle of assessment and booking;