大侠帮忙翻译,急!万分感谢!在线等着,关系到是否能抓住一个机会,请各位帮忙!

2024-12-13 20:25:32
推荐回答(1个)
回答1:

你这个汉语就写得很没品,没条理,没层次。乱的很,翻了一半不想翻了,没耐心了。给你一半好了,下面的找人接力吧~

Draw up plan of production and delivery. Follow up schedule of production, delivery and material, handle emergency. Order review and reply delivery date, coordinate with departments.
Analyze and adjust production capacity, coordinate sales plan, production plan, production schedule and material schedule, follow up the key link and make sure each workshop operate smoothly every day.
Make production order sheet, and packing list, arrange container.
Control production cost. Attend meeting of production, material schedule and ERP schedule.
Have ability of ERP(DingXin), TIPTOP(DingXin), Oracle,WORD,EXCEL,OUTLOOK etc. Be familiar with SAP, ISO9000, ISO14000.
Duty of PC: Meet the delivery date with the lowest cost and the best quality.
Material control and backlog control, draw up material schedule, purchase material, arrange in-warehouse and follow up. Handle emergent order, prevent and dispose overstock, monthly inventory verification, handling ECN.
Handle emergency on raw material in case of work held up for lacking of material. Control quality, delivery date, quantity of material while purchasing. Strict control on inventory, keep inventory carry rate high, eliminate overstock.