英语高手翻译帮个忙

2025-01-07 18:59:33
推荐回答(1个)
回答1:

This design is a chemical process according to the production requirements, need to work with steam pressure and 0.6 MPa for 0.9 MPa saturated steam, two steam content of 0.6 t/t/h h, 5.35. Because of project area at present, there is no heating planning, to meet production requirement, we need new steam heating boiler to meet a need. Considering the actual project selection of boiler YongQiLiang production, considering the energy saving and investment saving, after consultation with the owners choose A model for SZL6-125 - A Ⅱ assembly boiler. Design major areas: according to the SZL6-125 - AII right supporting auxiliary boiler choose, auxiliary selected, will auxiliary boiler installation with design, will they decorate construction area in particular 180m ² area, for the boiler for piping installation design, formed a complete thermodynamic system. According to the design process of boiler auxiliary system characteristics of various design, system design scheme after correlation calculation and auxiliary selection, finally will each auxiliary equipment use suitable pipeline into an organic whole repeatedly with the boiler, complete equipment installation design and piping design. Main auxiliary system with water processing system, water supply and drainage systems, water system, air system, steam, a system of dust removal system. The design of the key: according to send complete equipment system design and selection of air and gas pipeline design; auxiliaries According to the design of the system and the calculation of the selection soda pop equipment complete thermodynamic system drawing, Based on thermodynamic system diagram completion of overall arrangement and soda equipment design and installation of piping steaming-water pipe. Finally, draw boiler equipment layout and installation plan and related equipment section, boiler piping diagrams, provide technical support for new boiler design goal, total.

~.~